Core drilling, concrete cutting and planting works (Eurasia Metro Group Joint Venture). A total of 21,300 line meters and 26 truss under rail reinforced concrete manufacturing, PMA elevated road steel foot anchors and reinforced concrete manufacturing, reinforcement of the swinging rail studs in the entire line by injection method, rail fixture and probe manufacturing (Rhonberg – Kalebozan).





