Polatlı Şişecam Factory Construction

Istanbul

City
Trakya

Project Name
Polatlı Şişecam Factory Construciton

İşveren
Gülermak Ağır Sanayi İnşaat Taahhüt A.Ş.


In Ankara Polatlı Organized Industrial Zone, the contractor Gülermak Ağır Sanayi İnşaat ve Taahhüt A.Ş. Trakya Cam Polatlı TR-7 Flat Glass Factory, which is under construction by Trakya Cam Polatlı, has 10 main buildings (blending-oven-bathroom-cooling-cutting-warehouse-administrative and social building etc.) and 20 buildings with a total construction area of ​​82.000 m2 on an area of ​​366,000 m2. It includes the construction of ancillary facility buildings (lpg-conveyor lines, generator building-material warehouse, etc.). The total duration of the work is 20 months and was completed in 2014. Our commitment includes 45,000 m3 of concrete, 6,000 tons of reinforced concrete steel, 100,000 m2 of formwork manufacturing and assembly work.